Dane Valley Gallery
S
POOL 3
|
|
|
|
|
|
|
|
|
|
|
|
A mixed bag going in
|
|
|
|
A small catch but the first photo from Pool 3
|
|
|
POOL 1
|
|
|
The 1st Day!
|
|
|
|
|
|
This gives an indication of the extra dredging required.
|
|
|
|
|
Islands still to be raised due to the extra height around the banks
|
|
|
|
|
|
|
Islands being bolstered and raised
|
|
|
|
|
|
|
|
The liner with top soil on
|
|
|
|
|
Showing the liner backfill trench
|
|
|
|
You get an idea of the scale on this pic
|
|
|
|
In July Filled. The island is already starting to grass over!
|
|
|
POOL 2
|
|
|
Pool 2 starts
|
|
|
|
|
|
The liner going in
|
|
|
|
|
These lads from AJK plant hire have been superb.
|
|
|
|
|
Covered and ready for filling. This pool has a gentle slope with only a small ledge
|
|
|
|
|
Hey up what's this!
|
|
|
|
|
Hmmm the plot thickens
|
|
|
|
Ah Water! You can get an idea of the depth as well here
|
|
|
|
|
|
|
I'm Filling up!
|
|
|
|
Filled in July
|
|
|
|