Background
This
Site was purchased 7 years ago and as many of you know it has been in a
state of flux ever since. Although we did try many times to fix the leakage
problems we began to realise that the lakes needed some thorough attention.
We then put the development on hold and started to work upon detailed plans
for the site.
It soon came to our
attention that this project whilst costing considerably more than first
considered would be a major benefit to the local community and as such we
decided to seek funding from external sources.
Although
Northwich Anglers are providing the main funding for the project we have
been working alongside the Environment Agency who also see this as a
community project and as such have provided significant funding to allow the
project to start. The Environment Agency also see the site key for the
developing young anglers
The Plan
Located on
Shipbrook road Rudheath
Site will be
developed in two phases, phase one 2007, and phase two during 2008 if
funding is available.
There will be a plan of the complex here soon
Local community benefits
-
Provides
a unique facility for juniors
-
Upgrading and landscaping of the site including public access.
-
Many
locals use the Public footpath that runs through the site and have
already commented on the improvement this will make to the community.
Phase One
-
Two
pools (Pools 1 and 2 at the top of the complex) will be dredged and
reshaped.
-
The
pools will then be lined and covered with 300mm soil.
-
Hoping
to stock the pools early autumn (details of fish stocks to follow).
-
Modifications to the entrance and main car parking area.
-
Public
right of way and roadway running through the site will be upgraded.
-
Fauna and trees to be
planted along with general landscaping
-
Local
parking will be provided at all pools.
-
Although
the Association does not have a disabled section we intend to provide
improved stages for the disabled, local parking will also help.
-
Obviously
the site will be of benefit to all our members, the site will also
provide a training facility for our junior members, the Environment
Agency also want to use the site for the development of junior anglers
from within and outside our local community.
-
The
pools will also be available for rent to outside clubs for matches.
-
The
income will provide funding for the continual development of the site.
-
Local
parking will also provide easy access to the river Dane
Progress
-
All work
is being carried out by local contractors AJK plant from Whitley who
apart for doing the work have offered NAA considerable advice in
developing the site and were key in selecting the liner.
-
Work is
expected to take about eight weeks.
-
As at mid June pool 2
has need dredged, lined and filled. The larger pool 1 is expected to be
in the same position by the end of June
-
From the end of June
and into July, due to the poor weather work had been suspended, but the
pools are now filled and there are even some fry in there from pumping
the Dane!
-
All Photos can be seen
in the gallery
Phase Two
-
Merge pools 3 and 4
together as one very large pool
-
Move away from the Dane and
raise the Dane banks to prevent flooding.
-
Fauna and trees to be
planted along with general landscaping
-